Menu
Seach Site
Client portal
Solutions
Campus & Build-to-Suit
Powered Shell
Commissioned Capacity
Locations
AMERICAS
Atlanta
Calgary
Chicago
Dallas-Fort Worth
New Albany
Northern Virginia
Phoenix
Portland
Silicon Valley
Toronto
ASIA PACIFIC
Canberra
Melbourne
Osaka
Seoul
Tokyo
EMEA
Copenhagen
Frankfurt
Geneva
Milan
Oslo
Stockholm
Zurich
Resources
Brochures
Blog
Data Sheets
White Papers
Videos
Case Studies
Other
About
Meet the Team
Careers
News / Events
Responsibility
Health & Safety
Contact
Client portal
Seach Site
TAKE A TOUR
RESOURCES
ENTERPRISE DATA CENTER MAINTENANCE AND CAPEX FORECAST ESTIMATOR
INPUT YOUR SPECIFIC NEEDS IN THE FIELDS BELOW FOR THE MOST ACCURATE INFORMATION.
DATA CENTER PROFILE
Raised Access Floor
No
YES
NO
Year Last Commissioned
2010
Before 2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Data Center Critical IT Capacity
?
Designed Capacity of the Data Center
Data Center Critical IT Capacity [kW]
kW
IT White Space
?
Square footage of the actual computing space not including external support spaces like UPS rooms or equipment galleries.
IT White Space
ft
2
Current Power Density
?
A 2021 survey from the Uptime Institute indicates 36% of data centers operators are below 10kW per rack and 36% of operators are between 10-19 kW per rack. Only 12% of users are above 30 kW per rack. Data also shows an inverse relationship between rack density and annualized PUE.
Current Power Density
W/ft
2
Geography
LOCATION
USA
USA
CANADA
City
Portland, OR
Atlanta, GA
Chicago, IL
Dallas, TX
New Albany, OH
Northern VA
Phoenix, AZ
Portland, OR
Silicon Valley, CA
Portland, OR
Calgary, AB
Toronto, ON
ELECTRICAL TOPOLOGY
UPS Redundancy
?
Uptime Institute's 2020 global survey show a shift away from 2N and a shift towards N+2.
USA
None
N
N + 1
2N
Battery Runtime
?
UPS batteries are typically sized to allow ride through to generator start but may also consider a data center user's risk profile.
Portland, OR
10 or more
9
8
7
6
5
4 or less
Mins
Battery Type
Portland, OR
VRLA
Lithium Ion
Wet Cell
Generator Redundancy
USA
None
N
N + 1
2N
MECHANICAL TOPOLOGY
Heat Rejection Type
?
In 2018, data centers used 135.5 billion gallons of water.
USA
Water-Cooled
Air-Cooled
Equipment Type
Portland, OR
Chillers / Cooling Tower
INDIRECT EVAPORTIVE COOLING
Direct Evaporative
Other
Portland, OR
Air-Cooled Chillers
DX RTUs
CRAC units
Other
Plant Redundancy
?
Use of data availability zones and multisite resiliency has decreased data center cooling redundancy in 2020.
Portland, OR
N
N + 1
2N
Estimated Annualized PUE
?
Power Usage Effectiveness (PUE) = (Total Facility Energy) / (IT Equipment Energy). Uptime institute's 2021 survey indicates that respondents' global average annualized PUE in 2021 was 1.57 versus an average PUE of 1.98 in 2011.
USA
1.35 - 1.6
< 1.35
> 1.6
FORECASTED Capex Cost
2 Year Total CapEx Forecast
$
322,548
5 Year Total CapEx Forecast
$
322,548
10 Year Total CapEx Forecast
$
322,548
Fill out the form below to receive your CAPEX Forecast Results.
EMAIL RESULTS
To use web better, please enable Javascript.