Toronto-video-clip-top

TOR01 – Toronto

48MW of expansion at our established Toronto campus positioning you for success in Canada’s economic powerhouse.

Schedule a tour

TOR01 Campus

Located in North America’s third largest tech sector, STACK’s TOR01 campus offers scalable, high-performance infrastructure solutions across 19 acres with a total critical capacity of 56MW. TOR01 is strategically positioned 7 miles from downtown Toronto and Canada’s largest carrier hotel, 151 Front St. ensuring seamless connectivity between Canada and key U.S. markets. 

Designed to meet the growing demands of AI workloads, the future phase of TOR01 is backed by committed power from Toronto Hydro and supported by three diverse substations. This provides reliable, sustainable capacity—an essential advantage in today’s competitive data center landscape. 

DOWNLOAD BROCHURE

Isolation

56mw

Vector

3 Buildings

text-card-icon-1

19 ACRES

TOR01 Campus Data Centers

TOR01A

Vector 158,000 SQ FT
Isolation 8MW
TOR01A-TF

TOR01B

Vector 217,000 SQ FT
Isolation 24MW

TOR01B features 24MW across 217,000 square feet and is located directly south of TOR01A, playing a vital role in the campus’s expansion.

Download Brochure

TOR01B-TF

TOR01C

Vector 217,000 SQ FT
Isolation 24MW

TOR01C, featuring 24MW and 217,000 square feet, is positioned east of TOR01B.

Download Brochure

TOR01C-TF
STACK-Portland-Footer-2

Interested in learning more? 

Connect with Us