NVA01A
NVA02
  • NVA02A
  • NVA02B
  • NVA02C
  • NVA02D
  • NVA02E
  • Future Expansion
NVA04
NVA05
  • NVA05A
  • Future Expansion
NVA06

NVA01A Data Center


NVA01A Data Center


Our NVA01A facility in the heart of Ashburn offers exceptional levels of resiliency, redundancy, and security for your most mission-critical workloads.

SCHEDULE A TOUR

COMPLIANCE
  • Uptime M&O certification
  • HIPAA/HITECH
  • PCI/DSS
  • SSAE 18
  • ISO 27001
2 Million +
180,000 SQ. FT.
power
17 MW
Uptime Institute Approved
Uptime Institute Approved
CAPACITY & AMENITIES
POWER & RELIABILITY
COOLING & EFFICIENCY
CONNECTIVITY
SAFETY & SECURITY
TOTAL CAPACITY

17MW

FACILITY SIZE

180,000 SQ FT

DEPLOYMENTS

POWERSTACK™: Immediately available shell capacity

WORK SPACE

Conference and break rooms

Complimentary WiFi

Shared and dedicated office space

STORAGE

Shared and private storage/staging

CLIENT CONVENIENCES

Showers

Bicycle storage

Multi-bay secure loading dock

Diverse Utility and Power Sources

Multiple utility feeds

Served by Dominion Energy 

Fuel Storage

Minimum 48 hours of operation

Generators 

N+2 redundancy

UPS

N+1 UPS configuration

PDU

2N PDU distribution

BMS Controls

Client access to BMS portal

Building Hardening

221 mph wind-rated structure (EF5)

Flood Plain

Above 500-year flood plain

Cooling

N+1 chilled water system

N+2 CRAH units

Efficiency

Waterside economization

Storage 

72+ hours chilled water storage

Density

High density deployments supported in excess of 25 kW per cabinet

Diversity

2 Meet-Me-Rooms with diverse fiber entrances

Carrier Availability

Multiple carriers

Carrier neutral

Dark fiber available 

Additional Connectivity

Antenna space available

Security

Dual-factor biometric access

24 x 7 on-site security personnel

CCTV coverage with 93-day retention

Secure vehicle gates with badge access

Perimeter fencing

Fire Protection 

VESDA smoke detection system

Dual-interlock pre-action sprinkler system

NVA02 Campus

  • NVA02A
  • NVA02B
  • NVA02C
  • NVA02D
  • NVA02E
  • Future Expansion

NVA02 Campus

  • NVA02A
  • NVA02B
  • NVA02C
  • NVA02D
  • NVA02E
  • Future Expansion

STACK’s Prince William County campus NVA02 will be home to at least eight data centers and provide 420MW for incredible scalability. Two dedicated 300MW onsite substations will supply committed and scalable power from Northern Virginia Electric Cooperative (NOVEC) at low cost with high reliability.

SCHEDULE A TOUR

CAPACITY & AMENITIES
POWER & RELIABILITY
COOLING & EFFICIENCY
CONNECTIVITY
SAFETY & SECURITY
Campus Capacity

420MW

Campus Size

2,300,000 SQ FT

Deployments

POWERSTACK™: Immediately available shell capacity

READYSTACK™: RackReady® data halls

HYPERSTACK™: Build-to-suit

Workspace

Conference and break rooms

Complimentary WiFi

Ample shared and dedicated office space

Storage

Shared and private storage/staging

Client Conveniences

Electric Vehicle (EV) parking spaces

Showers

Bicycle storage

Multi-bay secure loading dock

Utility Service

Multiple utility feeds

Fuel

100% Renewable Energy

Substation

Two 300MW dedicated onsite substations from Northern Virginia Electric Cooperative (NOVEC)

Electrical Redundancy (Generators / UPS)

N+1 Block Redundant

Fuel Storage

Minimum 24 hours of operation

PDU

Client-dedicated PDU distribution

BMS Controls

Client access to BMS portal

Cooling

N+1 345-ton air-cooled chillers per lineup with VSD and quick restart

Density

Deployments supported in excess of 8kW per cabinet

Diversity

Each building has a minimum of 2 Meet-Me-Rooms with diverse fiber entrances

Carrier Availability

Access to 10 networks

Dark fiber available

Security

24 x 7 on-site security personnel

Dual-factor biometric access

CCTV coverage with 93-day retention

Secure vehicle gates with badge access

Perimeter fencing

Fire Protection

Dual smoke detection including VESDA

Dual-interlock pre-action sprinkler system

NVA02A Data Center

  • NVA02A
  • NVA02B
  • NVA02C
  • NVA02D
  • NVA02E
  • Future Expansion

NVA02A Data Center

  • NVA02A
  • NVA02B
  • NVA02C
  • NVA02D
  • NVA02E
  • Future Expansion

This 40MW facility features low-cost power and high reliability in the heart of Prince William County.

2 Million +
227,000 SQ. FT.
power
40 MW

NVA02B Data Center

  • NVA02A
  • NVA02B
  • NVA02C
  • NVA02D
  • NVA02E
  • Future Expansion

NVA02B Data Center

  • NVA02A
  • NVA02B
  • NVA02C
  • NVA02D
  • NVA02E
  • Future Expansion

Neighboring NVA02A, this site also features committed and scalable power from Northern Virginia Electric Cooperative (NOVEC).

2 Million +
227,000 SQ. FT.
power
40 MW

NVA02C Data Center

  • NVA02A
  • NVA02B
  • NVA02C
  • NVA02D
  • NVA02E
  • Future Expansion

NVA02C Data Center

  • NVA02A
  • NVA02B
  • NVA02C
  • NVA02D
  • NVA02E
  • Future Expansion

STACK’s NVA02C is located in Prince William County and adjacent to a massive 300MW substation.

2 Million +
15,000 SQ. FT.
power
2 MW

NVA02D Data Center

  • NVA02A
  • NVA02B
  • NVA02C
  • NVA02D
  • NVA02E
  • Future Expansion

NVA02D Data Center

  • NVA02A
  • NVA02B
  • NVA02C
  • NVA02D
  • NVA02E
  • Future Expansion

Powered by 100% renewable energy, NVA02D provides scalability while advancing sustainability goals.

2 Million +
280,000 SQ. FT.
power
36 MW

NVA02E Data Center

  • NVA02A
  • NVA02B
  • NVA02C
  • NVA02D
  • NVA02E
  • Future Expansion

NVA02E Data Center

  • NVA02A
  • NVA02B
  • NVA02C
  • NVA02D
  • NVA02E
  • Future Expansion

Similar to the broader campus, NVA02E utilizes low-carbon concrete to reduce greenhouse gas emissions and support long-term sustainability commitments.

2 Million +
280,000 SQ. FT.
power
36 MW

NVA02 Future Expansion

  • NVA02A
  • NVA02B
  • NVA02C
  • NVA02D
  • NVA02E
  • Future Expansion

NVA02 Future Expansion

  • NVA02A
  • NVA02B
  • NVA02C
  • NVA02D
  • NVA02E
  • Future Expansion

The NVA02 future expansion features 260MW of capacity in this valuable and competitive market.

2 Million +
1,300,000 SQ. FT.
power
260 MW

NVA04 Campus


NVA04 Campus


Centrally located in the power and land-constrained, and highly valuable, Northern Virginia market, this campus spans 80 acres with plans for three buildings featuring high-capacity dark fiber and access to all major long haul fiber carriers. Carve out a place for sustainable growth and resiliency in Data Center Alley.

SCHEDULE A TOUR

NVA05 Campus

  • NVA05A
  • Future Expansion

NVA05 Campus

  • NVA05A
  • Future Expansion

A 34-acre development near Manassas brings 84MW of critical capacity to this highly sought-after market. Utilizing STACK’s efficient Basis of Design, this campus offers a combined total of 336,000 sq. ft. of data hall space. NVA05 is located directly adjacent to existing high-voltage transmission lines connected to a NOVEC substation, which will be expanded to support the site. Plentiful fiber offers fast connectivity and robust options to support growing needs of hyperscalers and large enterprises.

SCHEDULE A TOUR

map
34 ACRES
power
84 MW
2 Million +
602,000 SQ FT
CAMPUS

NVA05A Data Center

  • NVA05A
  • Future Expansion

NVA05A Data Center

  • NVA05A
  • Future Expansion

NVA05A provides 36MW of powered shell and commissioned capacity within its 262,000 sq. ft. building for flexible options. STACK’s Basis of Design features energy efficient equipment, low-water use operations, and 100% renewable energy. NVA05A supplies speed at scale to one of North America’s most constrained markets.

SCHEDULE A TOUR

NVA05 Future Expansion

  • NVA05A
  • Future Expansion

NVA05 Future Expansion

  • NVA05A
  • Future Expansion

The future expansion takes optionality one step further with 48MW of a HYPERSTACK build-to-suit opportunity, providing control for hyperscalers and large enterprises looking to customize facilities to meet their needs.

SCHEDULE A TOUR

NVA06 Campus


NVA06 Campus


This 72MW campus in Leesburg, Virginia spans 32 acres and is powered by the Northern Virginia Electric Cooperative (NOVEC). Featuring AI-Ready capabilities, the campus seamlessly incorporates STACK’s proven, customizable design. Tailored for high-density workloads, STACK’s commitment to technological innovation aligns with its dedication to positively impacting the local community.

SCHEDULE A TOUR

map
32 ACRES
power
72 MW
2 Million +
620,000 SQ FT
CAMPUS

READY TO TALK TO
A STACK EXPERT?