TOR01
  • TOR01A
  • Future Expansion

TOR01 Campus

  • TOR01A
  • Future Expansion

TOR01 Campus

  • TOR01A
  • Future Expansion

Producer of 20% of Canada’s GDP and the host of the third largest tech sector in North America, Toronto is home to both hyperscalers and STACK’s TOR01 campus, which spans 19 acres (7.5 hectares) and has a critical capacity of 56MW. The campus offers build-to-suit options, powered shell availability, and commissioned critical capacity, all located near downtown Toronto, Canada’s largest carrier hotel.

SCHEDULE A TOUR

TOR01A Data Center

  • TOR01A
  • Future Expansion

TOR01A Data Center

  • TOR01A
  • Future Expansion

Get into Canada’s most constrained market, fast. TOR01A features available powered shell and commissioned critical capacity, only six miles (10km) from 151 Front Street in downtown Toronto.

SCHEDULE A TOUR

TOR01 Future Expansion

  • TOR01A
  • Future Expansion

TOR01 Future Expansion

  • TOR01A
  • Future Expansion

Centrally located with contracted access to power and robust connectivity, TOR01 Future Expansion is strategically located just 7 miles from Toronto’s primary internet exchange point, 151 Front Street. This campus offers 24MW of sustainable power in its upcoming development phase planned for Q2 2026.

SCHEDULE A TOUR

READY TO TALK TO
A STACK EXPERT?