Menu
Seach Site
Client portal
Solutions
Campus & Build-to-Suit
Powered Shell
Commissioned Capacity
Locations
AMERICAS
Atlanta
Calgary
Chicago
Dallas-Fort Worth
New Albany
Northern Virginia
Phoenix
Portland
Silicon Valley
Toronto
ASIA PACIFIC
Canberra
Melbourne
Osaka
Seoul
Tokyo
EMEA
Copenhagen
Frankfurt
Geneva
Milan
Oslo
Stockholm
Zurich
Resources
Brochures
Blog
Data Sheets
White Papers
Videos
Case Studies
Other
About
Meet the Team
Careers
News / Events
Responsibility
Health & Safety
Contact
Client portal
Seach Site
TAKE A TOUR
RESOURCES
ENTERPRISE DATA CENTER MAINTENANCE AND OPEX ESTIMATOR
INPUT YOUR SPECIFIC NEEDS IN THE FIELDS BELOW FOR THE MOST ACCURATE INFORMATION.
INFRASTRUCTURE CONFIGURATION
Actual Critical IT Load
?
Power as read at the UPS output.
Actual Critical IT Load [kW]
kW
IT White Space
?
Square footage of the actual computing space of the data hall not including external support spaces like UPS rooms or equipment galleries.
IT White Space [ft2]
ft
2
Current Power Density
?
A data hall can range from 100 - 300 W/SF. A 2021 survey from the Uptime Institute indicates 36% of data centers operators are below 10kW per rack and 36% of operators are between 10-19 kW per rack. Only 12% of users are above 30 kW per rack. Data also show an inverse relationship between rack density and annualized PUE.
Current Power Density [W/ft2]
W/ft
2
Current Electrical Rate if known
?
Average utility costs by region can be found on the U.S. Energy Information Administration website
here.
Current Electrical Rate if known [$/kWh]
$/KWH
GEOGRAPHY / PROFILE
LOCATION
LOCATION
USA
CANADA
City
City US
Atlanta, GA
Chicago, IL
Dallas, TX
New Albany, OH
Northern VA
Phoenix, AZ
Portland, OR
Silicon Valley, CA
City Canada
Calgary, AB
Toronto, ON
ELECTRICAL TOPOLOGY
UPS Redundancy
?
Uptime Institute's 2020 global survey show a shift away from 2N and a shift towards N+2.
2N: 34%
N+2: 16%
N+1: 47%
N: 3%
UPS Redundancy
None
N
N + 1
2N
Generator Redundancy
Generator Redundancy
None
N
N + 1
2N
MECHANICAL TOPOLOGY
Heat Rejection Type
?
In 2018, data centers used 135.5 billion gallons of water
Heat Rejection Type
Water-Cooled
Air-Cooled
Plant Redundancy
?
Use of availability zones and multisite resiliency has decreased data center cooling redundancy in 2020.
2N: 11%
N+2: 19%
N+1: 65%
N: 5%
Plant Redundancy
None
N
N + 1
2N
Estimated Annualized PUE
?
Power Usage Effectiveness (PUE) = (Total Facility Energy) / (IT Equipment Energy). Uptime institute's 2021 survey indicates that respondents' average annualized PUE globally was 1.57 while the average in 2011 was 1.98.
Estimated Annualized PUE
< 1.35
1.35 - 1.6
1.6 - 2.0
> 2.0
OPERATIONAL COST BREAKDOWN
Annual Electric Utility Cost
$
322,548
Annual Maintenance Cost
$
322,548
Annual Taxes & Insurance (estimated)
$
322,548
Estimated Annual Operating Expenses
$
322,548
Equivalent STACK operating expenses
$
322,548
Annual Cost Savings
$
322,548
Fill out the form below to receive your OPEx Forecast Results.
EMAIL RESULTS
To use web better, please enable Javascript.